Criterios de interpretación de los requisitos de
ISO 9001:2015
--------------------------------------------------------------------------------------------------------------------------The company is forced to define activities which are submitted to the control and it
construction method, it could carry out through procedures, work instruction, check list, etc.
as well as meeting for review and work verification.
Example: the coordination of facilities and concrete structure.
8.3.3 Design and development inputs;
The project memories should collect d relevant information of construction unit which it will
be executed such as like:
-
Dimensions
Actions
Geotechnical data
Material to be used.
Functional requirement, technical requirements, etc.
Inputs ambiguous are not accepted, the company has to make sure the input are clear and
suitable for the design.
8.3.4 Design and development controls
The activities needed to accomplish this requirement are:
-
Verification of the convenience of solution adopted, ensure that solution meets
project requirement.
Check the solution’s development is correctly performed.
The both quality checks depend on the experience and responsibility of it designer and the
documentation of check could be a list check. This verification should be collected in project
own documentation.